Browse through our completed projects showcasing photos and full project descriptions

We pride ourselves on the ability to self-perform entire projects. 

The tasks we self-perform include but not limited to:
  1. Complete Project and Site Management
  2. Excavation and construction of cable duct lines
  3. Non-destructive excavation
  4. Power Cable installation ranging from 240V to 330kV (Low Voltage to Extra High Voltage)
  5. Bulk Excavation
  6. Trenching
  7. Directional Drilling / Underboring
  8. Concrete construction
  9. Saw cutting
  10. Spoil removal and disposal
  11. Traffic management services
  12. As Built’s
  13. Use of GPS Equipment

Project Enquiries

If you have a specific project you would like to have quoted please email.

Traffic Control Plans

If your project requires Traffic Control Plans, contact our Traffic Control Team who can design and submit your plans and apply for Road Opening licences as required. Please contact us via email on

109 Beaconsfield St
Silverwater NSW 2128
Australia

PO Box 755
Concord NSW 2137
Australia