Location
Bangor, Sydney NSW
Contract Value
4.5 million
Date
-
Project Overview
Ausgrid CONSAC Replacement Project Planned electricity supply upgrade work in Bangor

Full Details

JDG Civil were engaged to replace existing Ausgrid underground low voltage electricity cable in Bangor.
The existing cables were reaching the end of their serviceable life and required replacement as part of Ausgrid’s capital work program to allow Ausgrid to maintain a safe a reliable electricity network.

At the completion of the work all footpaths and driveways were restored.

This job was predominately excavated in rock and all trenching was finished at the end of May 2019.

Works included
8.8 km of trenching and under-boring in rock
8.8 km installation of new conduits banks
12 km of Low Voltage cables installed
Installation of new Service Pillars and removing the old Menai Pillars
Transfer of all services to new electricity distribution system

We pride ourselves on the ability to self-perform entire projects. 

The tasks we self-perform include but not limited to:
  1. Complete Project and Site Management
  2. Excavation and construction of cable duct lines
  3. Non-destructive excavation
  4. Power Cable installation ranging from 240V to 330kV (Low Voltage to Extra High Voltage)
  5. Bulk Excavation
  6. Trenching
  7. Directional Drilling / Underboring
  8. Concrete construction
  9. Saw cutting
  10. Spoil removal and disposal
  11. Traffic management services
  12. As Built’s
  13. Use of GPS Equipment

109 Beaconsfield St
Silverwater NSW 2128
Australia

PO Box 755
Concord NSW 2137